 PRESENTER: MIKE HASENKAMP\, Sr. PM\, PMO - NPPD
 Join Mike as he 
 discusses the Muddy Creek to Ord 115 kV Transmission Line Project
 In the
  summer of 2012\, high temperatures and drought conditions in the north ce
 ntral part of Nebraska led to electric loads larger than projected and lar
 ger than the electric system’s capacity to supply that load.&nbsp\; This
  resulted in power shut offs for some customers in the area.&nbsp\; The Mu
 ddy Creek to Ord 115 kV Transmission Line\, a new 40 mile long 115 kV tran
 smission line between Broken Bow and Ord\, built in response to the event\
 , will also address potential reliability issues in the area\, will provid
 e a redundant path between two radial transmission substations\, and will 
 enable future load growth in the area.&nbsp\; This line was built entirely
  by Nebraska Public Power District’s transmission and retail line crews 
 and was completed in March of 2018\, on time\, and under budget.
 Tuesday
 \, March 12th at Doane University
 5000 Central Park Drive\, Suite 117 
 – Lincoln\, Nebraska 68504 (Please use the South Entrance of the buildin
 g)
 6:00 pm -- Networking/Light Refreshment &amp\; 6:30 pm -- Meeting/Pro
 gram
 COST: $12.00 Members / $14.00 General Public
LOCATION:303 N 52nd St
DTSTART:20190312T230000Z
DTEND:20190314T010000Z
DTSTAMP:20260418T013502Z
ORGANIZER;CN=PMI Mid-Nebraska Chapter:MAILTO:vp-communications@pmimidnebras
 ka.org
END:VEVENT
END:VCALENDAR